Parking Lot addition at University Medical Center
The University of Alabama engaged Krebs Engineering to design a parking lot addition for...
The University of Alabama engaged Krebs Engineering to design a parking lot addition for...
Krebs calibrated Madison Utilities’ hydraulic model in 2017. Due to the large amount of...
Jefferson County Environmental Services has contracted with Krebs Engineering to initiate their vertical asset...
Krebs calibrated Carroll County Water Authority’s hydraulic model in 2018. In 2020, Krebs evaluated...
Tuskegee’s South Basin Wastewater Transfer project included consolidating wastewater treatment facilities to eliminate discharge...
Following the success of the Swan Creek Trunk Sewer Improvements – Phase 1 project,...
Krebs was engaged by Coweta County Water and Sewerage Authority (CCWSA) to design the...
As a long-time client, Athens Utilities engaged Krebs to design a new regional lift...
Guntersville Water and Sewer Board (GWSB) engaged Krebs Engineering to investigate the issues in...
Krebs worked with Athens to deploy flow monitoring equipment and identify areas of high...
The Slab Creek WWTP Improvements project increases treatment capacity from 3 MGD (average) to...
The Municipal Utilities Board of Albertville engaged Krebs Engineering to design the biosolids improvements...
The Vaughn Road 24” Ductile Iron Water main was originally installed in the 1980s....
The Snake Creek Water Treatment Plant (WTP) was originally constructed in 1998 with a...
In December of 1989, Carroll County Water Authority purchased an existing 500,000 gallon water...
Date: February 19, 2025
Krebs is committed to giving back to the community and supporting the education of…