Well No. 3 Treatment Improvements
Krebs was contracted by the Alabaster Water Board to evaluate and design membrane filtration...
Krebs was contracted by the Alabaster Water Board to evaluate and design membrane filtration...
The Vaughn Road 24” Ductile Iron Water main was originally installed in the 1980s....
The Snake Creek Water Treatment Plant (WTP) was originally constructed in 1998 with a...
In December of 1989, Carroll County Water Authority purchased an existing 500,000 gallon water...
Faced with aging infrastructure dating back to the 1920’s, the Opelika Utilities Board retained...
The Terris Tatum Tennessee River Intake Facility is a raw water intake for the...
Check out these project photos from earlier this month at the Fairhope WWTP Headworks…
Date: January 28, 2026 Location: University of Alabama in Huntsville
Date: February 10, 2026 Location: University of Alabama
Date: February 17, 2026 Location: Auburn University
The Meridianville 1.5 MG Elevated Water Storage Tank project, developed for the Madison County…
Date: February 27, 2026 Location: University of South Alabama
Krebs is committed to giving back to the community and supporting the education of…