Drinking Water


Well No. 3 Treatment Improvements

triangle triangle 2

Krebs was contracted by the Alabaster Water Board to evaluate and design membrane filtration for 2.5 MGD capacity at the Well No. 3 Water Treatment Plant.  The well was deemed under the influence by ADEM based on solids.  The project consisted of issuing a request for proposal for membrane filtration, evaluating the proposal, and designing the improvements.  The project included a new administration/lab area, electrical room, chemical feed improvements, and filter building.      

Project Location

Alabaster, AL

Project Owner

Alabaster Water Board

Project Size

$3,200,000

Project Stage

Complete