Alabaster Water Board engaged Krebs to design the improvements at the Highway 12 Booster Pumping Station. The improvements generally included replacing outdated horizontal split-case pumps, new electrical equipment, flow meter vault, Calcium Hypochlorite tablet feed system, miscellaneous yard piping, and architectural improvements. The new vertical in-line pumps met the capacity requirements for this booster pumping station and featured a smaller footprint to allow space for a future pump.